Operating Expenes Problem-Solving Through Workforce and Process Analysis For a Rubber Manufacturing Plant In Bandung

Authors

  • Mesli Sontania Bandung Institute of Technology (ITB)
  • Akbar Adhi Utama Bandung Institute of Technology (ITB)

DOI:

https://doi.org/10.35870/emt.v8i3.2875

Keywords:

Business Process Mapping, Workload Analysis, Rubber Manufacturing

Abstract

High operational costs have had a major impact on Bandung's CV XYZ rubber production plant. Labor, specifically in the completed goods section, accounts for the largest portion of operational expenditures, costing Rp 377,190,000. A labor and process efficiency study is required in order to cut expenses. This study intends to evaluate the labor and process performance of CV XYZ's finished goods division and make recommendations for enhancements. CV XYZ has enough capacity, according to the capacity study, to satisfy current demand without going beyond. Small products are used 65.91% of the time, medium products 67.73%, and large products 53.81%. The efficiency rate for medium-sized products is 81.59%, large-sized products is 64.82%, and small-sized products is 79.41%. Waiting waste was identified as the most common process by a thorough process mapping. Eight workers were found to be under load, whereas one worker had a typical workload, according to the workload study. Reengineering business processes proposes integrating components or operations to better. During the rubber vulcanization process, the suggested method cuts down on worker idle time. The new workload distribution is computed using the re-engineered business process as a base. Even though it falls under the under-load category, this leads to fewer employees and a greater burden. By using this suggested method, CV XYZ can save Rp 125.730.000,00, or 33% of its direct labor expenditures

Downloads

Download data is not yet available.

Author Biographies

  • Mesli Sontania, Bandung Institute of Technology (ITB),

    School of Business and Management (SBM), Bandung Institute of Technology (ITB), Bandung City, West Java Province, Indonesia

  • Akbar Adhi Utama, Bandung Institute of Technology (ITB),

    School of Business and Management (SBM), Bandung Institute of Technology (ITB), Bandung City, West Java Province, Indonesia

References

Damij, N. (2007). Business process modelling: The new framework. Springer.

Hammer, M., & Champy, J. (1993). Reengineering the corporation: A manifesto for business revolution. Harper Business.

Heizer, J., Render, B., & Munson, C. (2020). Operations management: Sustainability and supply chain management. Pearson.

Krajewski, L. J., Malhotra, M. K., & Ritzman, L. P. (2019). Operations management: Processes and supply chains. Pearson.

Liker, J. K. (2004). The Toyota way: 14 management principles from the world's greatest manufacturer. McGraw-Hill.

Object Management Group. (2011). Business process model and notation (BPMN) version 2.0. Retrieved from http://www.omg.org/spec/BPMN/2.0

Ohno, T. (1988). Toyota production system: Beyond large-scale production. Productivity Press.

Pyzdek, T., & Keller, P. A. (2010). The Six Sigma handbook: A complete guide for green belts, black belts, and managers at all levels. McGraw-Hill.

Rother, M., & Shook, J. (2003). Learning to see: Value stream mapping to add value and eliminate MUDA. Lean Enterprise Institute.

Slack, N., Brandon-Jones, A., & Johnston, R. (2016). Operations management. Pearson.

Stevenson, W. J. (2018). Operations management. McGraw-Hill Education.

Taufan, S., Rahmawati, R., Mujiyono, M., & Iskandar, D. A. (2023). Workload analysis with the full time equivalent method approach to determine workforce required. Jurnal STEI Ekonomi, 32(2), 211–222. https://doi.org/10.36406/jemi.v32i02.1371

Wahyulistiani, D., Yani, E. S., Supriyono, S., & Syafri, M. (2022). Workload analysis to determine the number of labor in soap production using the full time equivalent method: A case study of PT. XY. Journal of Industrial Engineering Management, 7(3), 232–237. https://doi.org/10.33536/jiem.v7i3.1322

Womack, J. P., Jones, D. T., & Roos, D. (1990). The machine that changed the world. Free Press.

Downloads

Published

2024-07-20

Issue

Section

Articles

How to Cite

Sontania, M. (2024). Operating Expenes Problem-Solving Through Workforce and Process Analysis For a Rubber Manufacturing Plant In Bandung (A. A. Utama, Trans.). Jurnal EMT KITA, 8(3), 1118-1132. https://doi.org/10.35870/emt.v8i3.2875